Tasteful build! And 8 weeks seems fast nowadays! Seemed like average build time had crept up over the years, to be closer to a handful of monthsMy V5M arrived. Build took about 8 weeks. I’m very happy with it! Great wood & build quality, heavier than I expected for an alder body.
Setup was good with the Dunlop super bright strings, but I prefer flats so I changed them for LaBella Low Tension Flats (love them on my 4-string!). Intonation on the LTF’s required some serious bridge adjustment… barely got there on the B string with the saddle bottomed out… had to remove the spring to get there.
Anybody else use LTF’s on a Kiesel 35-33.5 multi-scale?